Jobs in Progress:
First picture is of the suite before construction starts and the other two are after concrete removal. Then we have all utilities installed ready for inspections. After inspections we complete back fill install vapor barrier and dowels, ready for concrete. Concrete has been replaced and framing is complete. Utilities have been installed and inspected, drywall is complete with first coat of paint. The Adec equipment has arrived and installation has started.